Satellite · NORAD 33596 · COSPAR 2009-007B
EXPRESS-MD1
- Operator Commonwealth of Independent States (former USSR)
- Constellation —
- Country Russia
Altitude now
—
no element set
Velocity
—
Inclination
10.37°
Period
1.0 d
1,452.9 min
Perigee
36,077km
Apogee
36,151km
orbit unavailableNo orbital element set on file.· Metadata updated 9 h ago
Live position
Live position
Live position unavailable — no public orbital element set exists for this object (it may be classified, untracked or too small to catalogue).
Mission
Mission & classification
- Mission type derived
- Communications
- Object type
- Payload
- SATCAT ops status
- Non-operational [-]
- Radar cross-section
- 0.0 m²
CelesTrak groups
Not listed in any CelesTrak group.
Aliases
- EXPRESS-MD1Celestrak Satcat
Ownership
Operator & country
- Operator
- —
- SATCAT owner code
- CIS · Commonwealth of Independent States (former USSR)
- Country
- Russia RU
Launch
Launch
- Launch date
- 11 Feb 2009
- COSPAR launch id
- 2009-007
- Launch site
- Baikonur Cosmodrome (Tyuratam)
Objects from the same launch · 3
- BREEZE-M DEB [TANK]33597DebrisDecayed
- EXPRESS-AM4433595PayloadActive
- BREEZE-M R/B33598Rocket bodyInactive
Change log
History
No changes recorded since first ingestion on 11 Sept 2026 18:54 UTC. Status, orbit class, name and ownership changes are logged here as sources are re-ingested.
Regulatory
UN registration
Transparency
Sources & provenance
No source is linked to this record yet — the catalogue row exists but no provenance entry has been written for it.
Field provenance
No field-level provenance recorded.
Timeline
Events
No events detected for this object yet. Launches, decays and orbit changes are generated by the derived-analytics connector.
Reference
Identifiers
- NORAD catalogue number
- 33596
- COSPAR / international designator
- 2009-007B
- SatelliteIndex id
- sat_01M28X3JRME6M5V7NGY852J4WM
- Canonical slug
- express-md1-33596
Orbit class, mission type and constellation membership are derived by SatelliteIndex (Communications) — see the methodology. Positions are propagated estimates, not tracking measurements; never use them for conjunction assessment.