Satellite · NORAD 13652 · COSPAR 1982-110C
ANIK C3 (TELESAT 5)
- Operator Telesat
- Constellation Telesat (Anik / Telstar / Lightspeed)
- Country Canada
Altitude now
—
no element set
Velocity
—
Inclination
12.39°
Period
1.0 d
1,441.4 min
Perigee
35,884km
Apogee
35,895km
orbit unavailableNo orbital element set on file.· Metadata updated 9 h ago
Live position
Live position
Live position unavailable — no public orbital element set exists for this object (it may be classified, untracked or too small to catalogue).
Mission
Mission & classification
- Mission type derived
- Communications
- Object type
- Payload
- SATCAT ops status
- Non-operational [-]
- Radar cross-section
- 2.9 m²
- Constellation membership derived
- Telesat (Anik / Telstar / Lightspeed) via name_pattern
CelesTrak groups
Not listed in any CelesTrak group.
Aliases
- ANIK C3 (TELESAT 5)Celestrak Satcat
Ownership
Operator & country
Launch
Launch
- Launch date
- 11 Nov 1982
- COSPAR launch id
- 1982-110
Objects from the same launch · 4
- STS 513650PayloadDecayed
- SBS 313651PayloadUnknown
- SBS 3 R/B [PAM-D]13658Rocket bodyInactive
- ANIK C3 R/B [PAM-D]13666Rocket bodyInactive
Change log
History
No changes recorded since first ingestion on 11 Sept 2026 18:54 UTC. Status, orbit class, name and ownership changes are logged here as sources are re-ingested.
Regulatory
UN registration
Transparency
Sources & provenance
No source is linked to this record yet — the catalogue row exists but no provenance entry has been written for it.
Field provenance
No field-level provenance recorded.
Timeline
Events
No events detected for this object yet. Launches, decays and orbit changes are generated by the derived-analytics connector.
Reference
Identifiers
- NORAD catalogue number
- 13652
- COSPAR / international designator
- 1982-110C
- SatelliteIndex id
- sat_01M28X3JN7A81WJ0MA395X80RB
- Canonical slug
- anik-c3-telesat-5-13652
Orbit class, mission type and constellation membership are derived by SatelliteIndex (Communications) — see the methodology. Positions are propagated estimates, not tracking measurements; never use them for conjunction assessment.