Satellite · NORAD 16274 · COSPAR 1985-109B
MORELOS 2
- Operator Mexico
- Constellation —
- Country Mexico
Altitude now
—
no element set
Velocity
—
Inclination
14.76°
Period
1.0 d
1,446.3 min
Perigee
35,965km
Apogee
36,009km
orbit unavailableNo orbital element set on file.· Metadata updated 8 h ago
Live position
Live position
Live position unavailable — no public orbital element set exists for this object (it may be classified, untracked or too small to catalogue).
Mission
Mission & classification
- Mission type derived
- Unknown
- Object type
- Payload
- Radar cross-section
- 7.6 m²
CelesTrak groups
Not listed in any CelesTrak group.
Aliases
- MORELOS 2Celestrak Satcat
Ownership
Operator & country
- Operator
- —
- SATCAT owner code
- MEX · Mexico
- Country
- Mexico MX
Launch
Launch
- Launch date
- 27 Nov 1985
- COSPAR launch id
- 1985-109
Objects from the same launch · 7
- STS 61B16273PayloadDecayed
- OPTUS A2 (AUSSAT 2)16275PayloadUnknown
- SATCOM K216276PayloadUnknown
- STS 61B OEX TARGET16277PayloadDecayed
- MORELOS 2 R/B [PAM-D]16293Rocket bodyInactive
- OPTUS A2 R/B [PAM-D]16294Rocket bodyInactive
- SATCOM K2 R/B [PAM-D2]16295Rocket bodyInactive
Change log
History
No changes recorded since first ingestion on 11 Sept 2026 18:54 UTC. Status, orbit class, name and ownership changes are logged here as sources are re-ingested.
Regulatory
UN registration
Transparency
Sources & provenance
No source is linked to this record yet — the catalogue row exists but no provenance entry has been written for it.
Field provenance
No field-level provenance recorded.
Timeline
Events
No events detected for this object yet. Launches, decays and orbit changes are generated by the derived-analytics connector.
Reference
Identifiers
- NORAD catalogue number
- 16274
- COSPAR / international designator
- 1985-109B
- SatelliteIndex id
- sat_01M28X3JNPWAC861BB3PEBHJ61
- Canonical slug
- morelos-2-16274
Orbit class, mission type and constellation membership are derived by SatelliteIndex (Unknown) — see the methodology. Positions are propagated estimates, not tracking measurements; never use them for conjunction assessment.