Debris object · NORAD 29106 · COSPAR 2005-049E
MSG-2 DEB [COOLER COVER]
- Operator EUMETSAT
- Constellation —
- Country —
Altitude now
—
no element set
Velocity
—
Inclination
12.87°
Period
23.7 h
1,423.3 min
Perigee
35,507km
Apogee
35,566km
orbit unavailableNo orbital element set on file.· Metadata updated 14 h ago
Live position
Live position
Live position unavailable — no public orbital element set exists for this object (it may be classified, untracked or too small to catalogue).
Mission
Mission & classification
- Mission type derived
- Debris
- Object type
- Debris
- Radar cross-section
- 0.0 m²
CelesTrak groups
Not listed in any CelesTrak group.
Aliases
- MSG-2 DEB [COOLER COVER]Celestrak Satcat
Ownership
Operator & country
- Operator
- EUMETSAT
- SATCAT owner code
- EUME · EUMETSAT
- Country
- —
Launch
Launch
- Launch date
- 21 Dec 2005
- COSPAR launch id
- 2005-049
- Launch site
- Guiana Space Centre, Kourou
Objects from the same launch · 5
- ARIANE 5 DEB [SYLDA]28914DebrisInactive
- MSG-2 DEB [BAFFLE COVER]29676DebrisInactive
- INSAT-4A28911PayloadUnknown
- METEOSAT-9 (MSG-2)28912PayloadActive
- ARIANE 5 R/B28913Rocket bodyInactive
Change log
History
No changes recorded since first ingestion on 11 Sept 2026 18:54 UTC. Status, orbit class, name and ownership changes are logged here as sources are re-ingested.
Regulatory
UN registration
Transparency
Sources & provenance
No source is linked to this record yet — the catalogue row exists but no provenance entry has been written for it.
Field provenance
No field-level provenance recorded.
Timeline
Events
No events detected for this object yet. Launches, decays and orbit changes are generated by the derived-analytics connector.
Reference
Identifiers
- NORAD catalogue number
- 29106
- COSPAR / international designator
- 2005-049E
- SatelliteIndex id
- sat_01M28X3JQXR6FFEMCFY4ZEC07G
- Canonical slug
- msg-2-deb-cooler-cover-29106
Orbit class, mission type and constellation membership are derived by SatelliteIndex (Debris) — see the methodology. Positions are propagated estimates, not tracking measurements; never use them for conjunction assessment.